The KMM Roofing System is designed based on a series of simply supported beams. It is the contractor's responsibility to provide a load-compliant supporting structure. Meanwhile, the contractor must strictly comply with the requirements of the Health & Safety, statutory regulation and relevant codes of practice throughout the project to implement full-process safety control.
Delivery and Storage
The contractor shall unload the aluminum components upon delivery and conduct a full visual inspection for damage. Before assembly, ensure all items are undamaged and qualified ,fit for purpose. Any damaged parts shall be segregated and replacement promptly.
Components can be stored in open-air areas, but the storage site shall be securely fenced, and protective measures shall be taken to keep the components clean to prevent debris from affecting subsequent installation accuracy.
Safety Considerations
A site-specific safe system of work shall be planned before the commencement of the project, which must fully match the on-site working conditions and assembly methods, rather than applying generic templates. All erection personnel shall receive adequate corresponding training. If required, the brand can provide supporting erection training and on-site technical supervision services.
Appropriate protective measures against falls from height shall be adopted throughout the process, with compliant safety lanyards, safety nets and other protection facilities configured according to the operation scenarios, to ensure zero safety risks during the entire installation process.
MAIN COMPONENTS

1 Aluminium Beam
These beams are made of high-strength 6082 T6 aluminum alloy and form the main structural components of the KMM roof. The spacing of the beam nodes is uniform, so adjacent spans can be combined in different lengths. From the side view, the vertical components are always in the same position, which ensures that the horizontal plane support of the roof remains completely consistent.
2:Ridge
Used to connect two elevations of Beams at the apex of the roof.


3 :Double Horizontal Frames
Used to connect two adjacent beam lines, attached to the vertical posts of the beams using a special claw casting.
The frequency of brace frame bays is dependent on a number of factors:
• Span required
• Erection by hand or crane
• Location of roof
• Imposed loads
4:Horizontal Brace
It is used to connect two adjacent beam lines and is installed on the upper and lower chords of the beam. The ends are equipped with special claw-shaped castings with track buttons. The frequency of the horizontal support depends on several factors:
• Whether it is fixed on the upper or lower chord
• The required span
• Manual or crane lifting
• Roof position
• Acting load